Skip to content
Team Experience

PT. Winepc Perkasa Enjiniring 

Your EPC Solution & Partner

Icon label

1)

Polyester Plant Project- PT. Indorama Synthetics, Purwakarta – West Java

2)

66 Yarn Plant Project-PT. Branta Mulia, Citeureup – West Java

3)

 Filamendo Sakti Tire Cord-PT. Filamendo Sakti, Tangerang – Banten

4)

Semen Tonasa IV Plant Project-PT. Semen Tonasa, Ujung Pandang – South Sulawesi

5)

 Tuban II Project-PT. Semen Gresik, Tuban – East Java

6)

Methanol Plant Project (Turn Over)-PT. Kaltim Methanol Indonesia, North Bontang – East Kalimantan

7)

Popka Plant Project-PT. Pupuk Kalimantan Timur, North Bontang – East Kalimantan

8)

Cement Tuban IV Plant Project-PT. Semen Bintang Mandiri, Tuban – East Java

9)

Cement Tuban IV Plant Project-PT. Semen Bintang Mandiri, Tuban – East Java

10)

NPK Plant Project-PT. Semen Gresik, Gresik – East Java

11)

Urea and Ammonia Project-PT. Kalimantan Timur, North Bontang – East Kalimantan

12)

Spinning Machine and Power Boiler Project-PT. Indo[1]Bharat Rayon, Purwakarta – West Java

13)

Zamrud Project-PT. Unilever Indonesia, Cikarang – West Java

14)

 Blue Sky Project-PT. Pertamina UP IV, Balongan, Indramayu – West Java

15)

Paper Machine #2 Project, Fiber Line 2C & Pulp Dryer #4 Project, RB#5 Project -PT. Pec – Tech. Pk. Kerinci, Pekanbaru – Riau

16)

Kurdistan GAS Recovery Plant-CRESENT Petroleum Company Limited-United Emirates Arab and Kurdistan Region of Irak

17)

 Tonasa V Plant Project-Pangkep Bitungkasi – Nort Sulawesi

18)

CNG Project Plant – PT PLN ,Jambi –PT Rekayasa Industri (REKIND)

19)

 Gondorukem Project Plant-PTPN, Pemalang

20)

Tie In Line Venting CO2 Removal Project –Pertamina, West Java

21)

 Regasification and Segregation-Petra Arun Gas Project, Pertamina, Aceh

22)

 Stasiun Kompresi Gas (SKG) Betung- Muara Enim, Sumatra Selatan

23)

 Kamojang V Project, Pertamina Geothermal Energy[1]Kamojang, Bandung – West Java

24)

STG Boiler Project-Pupuk Sriwijaya, Pelembang – South Sumatra

25)

EC3 Indarung VI Project-PT. Semen Padang – West Sumatra

26)

HVAC PCC Plant-PT IKBB (RAPP group), Pk. Kerinci, Pekanbaru – Riau

27)

Project Operation & Maintenance Services Electrical & Instrument Blanket (2017-2022)- PT South Pacific Viscose ( Lenzing Group), Purkawarta – West Java

28)

 2×25 MW FTP-2 CFSPP Lombok (PLTU)-PT. Rekayasa Industri (Rekind) -PT. PLN Persero, Sambelia – Lombok Timur

29)

 Project Operation & Maintenance Services Electrical & Instrument Blanket (2023-Now)- PT South Pacific Viscose ( Lenzing Group), Purkawarta – West Java

1.

 Project Operation & Maintenance Services Electrical & Instrument Blanket (2017-2022)- PT South Pacific Viscose ( Lenzing Group), Purkawarta – West Java

2.

Project Operation & Maintenance Services Electrical & Instrument Blanket (2023-Now)- PT South Pacific Viscose ( Lenzing Group), Purkawarta – West Java

 3.

 EPC HVAC , Electrical & Instrument EWTP Balongan- PT Rekayasa Industri (Rekind)-PT. Pertamina

4.

 HVAC System CS2 Recovery- PT. Asia Pacific Rayon-RAPP GROUP

5.

 HVAC for In-House Packaging Project- PT. Asia Pacific Rayon-RAPP GROUP

6.

Ventilation Cable Room- PT. Asia Pacific Rayon-RAPP GROUP

7.

 HVAC for In-House Packaging Project- PT RAK- April Asia (RAPP group) 8. HVAC PCC Plant-PT IKBB (RAPP group), Pk. Kerinci, Pekanbaru – Riau

9.

Perluasan & Renovasi Pabrik Gedung Extension PT Novell Pharmaceutical Laboratories-Bogor

10.

AHU Replacement & Installation Polio Project- PT Biofarma, Bandung, West java

11.

AHU Instalation Media Virus Project- PT Biofarma, Bandung, West java

12.

AHU Replacement & Instalation Formulation Project-PT Biofarma, Bandung, West java

13.

Biofarma New Avian Flu Facility Project-PT Biofarma, Bandung, West java

14.

R &D Fermenter 200L-75L-20L Project-PT Biofarma, Bandung, West java

15.

 Formulation Mixing Vessel 1200 LT Project- PT Biofarma, Bandung, West java

16.

Fermenter 750 LT Installation Project Project- PT Biofarma, Bandung, West java

17.

 Formulation Mixing Vessel 1200 LT Project -Project- PT Biofarma, Bandung, West java

18.

Fermenter 150 L Installation Project-PT. VAKSINDO, Bogor

19.

HVAC Inspection and Evaluation-CHEVRON GEOTHERMAL INDONESIA, Darajat, west Java

20.

GTG Ujung Pangkah Development Project-AMERADA HESS – IKPT

21.

Mike-Mike Fire & Gas Protection Upgrade Phase-1– BP WEST JAVA

22.

PT Rekayasa Engineering New Office Building -PT. REKAYASA ENGINEERING, JAKARTA

23.

 NPU Additional Accommodation Building TOTAL E&P, Balikpapan

24.

Paper Mill#3 Project-PT BUKIT MURIA JAYA (BMJ), West Java

25.

Banyu Urip Project (EPC-5)-MOBIL CEPU Ltd – PT REKAYASA INDUSTRI

26.

 Freeport Jayapura Office Project-PT FREEPORT INDONESIA

27.

Blast Furnace of Integrated Steel Mill Stage #1- KRAKATAU-POSCO – PT KRAKATAU ENGINEERING

28.

New Spare Engine Shelter at Senipah -TOTAL E&P, Balikpapan

29.

Bekapai Living Quarter (LQ) Platform Revamping Phase[1]2 Project-TOTAL E&P, Balikpapan

30.

PLTDG Pesanggaran Bali-PT INDONESIA POWER – PT. PP

31.

Build New Salak Housing & Multi-Purpose Building[1]CHEVRON GEOTHERMAL SALAK, West Java

32.

PPGM-Pembangunan Fasilitas Produksi Gas Donggi-PT PERTAMINA EP- PT REKAYASA INDUSTRI

33.

CP-9 Muara Karang-Muara Bekasi Pipeline Project-PT PGN – PT REKAYASA INDUSTRI

34.

Ulubelu Geothermal Plant area 3 & 4-PT PERTAMINA GE- PT REKAYASA INDUSTRI

35.

Lahendong Geothermal Plant area 5 & 6-PT PERTAMINA GE- PT REKAYASA INDUSTRI

36.

Gresik Gas Co-Generation Plant Project -PUPUK INDONESIA ENERGI-PP

37.

Proyek Reaktor Daya Ekperimental (RDE)-BATAN, Jakarta

38.

Mobil Power Plant 500MW Project -PT PLN Batam-PP

39.

Revitalisasi Terminal LPG Arun-PT PERTAMINA-PT BAS

40.

Biomass Power Plant project-PT AGRA BAREKSA ENERGY

41.

SWI and Outtake Grati Add On 150 MW-PT PP EPC Division – PT. PLN

42.

Konsultan Supervisi Enjiniring MPP Dan Fixed Type Gas Engine Power Plant Package II & III Project- Pusenlis, PT. PLN